Welcome to China Better Technology Co., Ltd!
24-Hour Hotline: 13306708055
Hydraulic engineering project
2018-08-29
 
When the rain season coming, some countries entered the flood season, and reservoirs have been impounded and many have been affected. provinces flood control command department, the Water Conservancy Bureau and other related departments have convened flood prevention and drought emergency meetings, the flood season this year, the typical flood control plan.
Flood prevention pump trucks for emergency flood control and drainage. The technical Commissioner immediately goes to the customer site for installation and commissioning when it receives the commissioning of the assignment. To this end, the company reminds us that the flood control pump can not be prepared because of the different working conditions. The production cycle is 1 to 2 weeks. This demand season is more tense to avoid greater economic losses.